Preliminary Consultation Information Request – DER Connections Home » Preliminary Consultation Information Request – DER Connections 1General Information2Project Information This form is for customers applying for a Preliminary Assessment for connecting a Distributed Energy Resource (DER). All fields are required. Email the completed form to generation@wellingtonnorthpower.com. If you have any questions, you may send them to the email or phone 519-323-1710.1. General Information:Project Name: Application Submission Date: YYYY slash MM slash DD Primary Contact: Contact Name: Telephone No.:E-mail Address: Address: Street Address Address Line 2 City Postal Code 2. Project Information:Project Intent: Inject energy to the grid Do not inject energy to the grid for: Other Project Intent - Do not inject energy to the grid for:(Required) Load Displacement Emergency Backup only when the grid is not available Other Please Specify Size:Proposed Installed Capacity (KW): Connecting on: Single phase 3 phase DER Type: Synchronous Induction Inverter based Other DER Type Other: DER Fuel/Energy Type: Site InformationMunicipal Address: Street Address City Postal Code Existing Account number (if applicable):