Connection Impact Assessment (CIA) Application 2 Home » Connection Impact Assessment (CIA) Application 2 Step 1 of 20 5% ABOUT THIS FORM This Connection Impact Assessment (CIA) application is to be completed by any proponent interested in connecting a Distributed Energy Resources (DER) with a project size over 10 kilowatts (kW) to Wellington North Power Inc. (WNP). This includes DER applying for a new CIA or for revision(s) to their original CIA. This form expresses an intent to enter into an agreement between WNP and the customer (or host customer* for load displacement projects) for completion of a CIA associated with connecting a DER to the WNP distribution grid. The CIA Application shall be part of the required servicing (electrical installation, maintenance, and operating) agreements between WNP and the proponent. Through this process, WNP will be the proponent’s contact with the transmission system provider (e.g. Hydro One Networks Inc.) and, if necessary, the provincial market operator, namely, the Independent Electricity System Operator (IESO). *For Load Displacement projects, the term “host customer” refers to the owner of the load facility. The term “DER owner” refers to the owner of the DER facility. Emergency Backup Generators - please call us at 519-323-1710 or e-mail generation@wellingtonnorthpower.com. TECHNICAL REQUIREMENTS For technical requirements of Wellington North Power Inc.'s DER projects, please call us at 519-323-1710 or e-mail generation@wellingtonnorthpower.com. SUBMISSION INSTRUCTIONS Please return the completed form, fees and other required documents by email to generation@wellingtonnorthpower.com or by mail to: Wellington North Power Inc. Attn: Operations Department, Generation Connection Application 290 Queen Street West, P.O. Box 359 Mount Forest, Ontario N0G 2L0 An engineering stamp and all red box fields (on electronic version of form) are mandatory. Incomplete applications may be returned by WNP and will result in delays in processing your application. Click the "Validate Form" button on the top right of this page to ensure all required information is filled. If any of the required fields are not applicable to your project, type "N/A" in any required text field or "0" in any required numerical field WNP specific requirements and notes are found in Sections S and T, respectively Applicants are cautioned NOT to incur major expenses until WNP approves to connect the proposed DER facility. All technical submissions (CIA Application, Single Line Diagrams, etc.) must be signed, dated and sealed by a licensed Ontario Professional Engineer (P.Eng.). The proponent will pay for the CIA according to the WNP CIA Fee Schedule. The siting restrictions in O. Reg. 274/18 which were administered by electricity distributors such as WNP have been replaced by amendments to the Planning Act (Ontario) that puts siting and planning requirements for renewable DER facilities under municipal oversight. It is recommended that you discuss municipal permitting and approvals requirements with the planning department in the municipality where your DER project is located before you proceed. SECTION A: APPLICATION INFORMATIONApplication Type:(Required)Choose oneNew CIA ApplicationCIA Revision / ReworkCapacity Increase RequestModifications or Addition to Existing ProjectReconnection of Existing GeneratorDate:(Required) MM slash DD slash YYYY Program Type / Purpose(Required)Choose oneSelectIESO (please specify)Load DisplacementNet MeteringNet Metering (Subdivision)Off-Grid Island Load GenerationOther (please specify)Program Type (additional details):Project Name:(Required)IESO Contract Number:IESO Reference Number:Ontario Corporate Number or Business Identification Number:(Required)Proposed In Service Date:(Required) MM slash DD slash YYYY Subdivision Project Name:If this project is a subdivision project, please complete the following fields:Number of Lots: Original CIA Project ID #:For certain application type selections, please complete the required fields:Revised Fields:List the fields that have changed from your previous application SECTION B: PROJECT LOCATIONAddress:City / Town / Township:Postal Code:Lot Number(s):Concession Number(s): SECTION C: CONTACT INFORMATIONCIA will be issued in the name of the host customer (load facility owner). All agreements (including CCA and DCA) are only made between WNP and the host customer. This section is strictly to gather contact information of some of the key contacts that are involved with the project.Who is the single point of contact for this project? Host Customer DER Owner (if different from host customer) Consultant Please enter the following information about the host customer (load facility owner)Contact Person:Company's Legal Name:Mailing Address:Including postal code, P.O. Boxes and Rural Routes will not be acceptedWork Telephone:Cell Phone:Fax Number:Email Address: Please enter the following information about the DER owner (if different from host customer) Contact Person:Company's Legal Name:Mailing Address:Including postal code, P.O. Boxes and Rural Routes will not be acceptedWork Telephone:Cell Phone:Fax Number:Email Address: Please enter the following information about the consultantContact Person:Company's Legal Name:Mailing Address:Including postal code, P.O. Boxes and Rural Routes will not be acceptedWork Telephone:Cell Phone:Fax Number:Email Address: SECTION D: CUSTOMER STATUSIs there an existing WNP account at the project location? Yes No Is the account holder aware of this application? Yes No Does your account fall within a residential-rate classification? Yes No Do not know Existing Account Number:Account Holder Name:Does the account holder have an HST registration number? Yes No HST Number: SECTION E: EXISTING DERAre there existing DER at the point of common coupling (PCC)? Yes No Existing Project Number:Existing Project Size (kW):Program Type For Existing DER:SelectIESO - Combined Heat and PowerIESO - Feed-In Tariff (FIT)IESO - Large Renewable ProcurementLoad DisplacementNet MeteringNet Metering (Subdivision)Off-Grid Islanded Load GenerationOther (please specify)Program Type For Existing DER: Synchronous Induction Inverter based Other DER Type: OtherFor synchronous unitsMin. power limit for stable operation kW:Direct axissub‐transient reactance, X’d pu:Direct axistransient reactance, X’d pu:Direct axissynchronous reactance, Xd pu:Zero sequence reactance, X0 pu:For induction unitsDirect axissub‐transient reactance, X’’d pu:Direct axistransient reactance, X’d pu:Total PF correction installed kVAR:For inverter based unitsInverter rating kVA:Maximum continuous power output kW: SECTION F: PROJECT INFORMATIONStation Name (optional to leave blank for behind the meter projects):NONEABBEY DSABERDEEN DSABERFOYLE DSABITIBI CANYON DSACTON CORNERS DSADAMS POINT DSADDISON DSAGIMAK DSAGINCOURT TSAGUASABON DSAILSA CRAIG DSALBAN DSALBION TSALEX EAST BOUNDARY DSALEX INDUSTRIAL DSALEX KENYON WEST DSALEX MARGARET DSALEX WEST BOUNDARY DSALEXANDER DSALFRED DSALLANBURG TSALLISTON TSALMA DSALMONTE TSALVINSTON DSAMHERSTVIEW DSAMULREE DSANCASTER WEST DSANDERDON DSANGUS DSAPPIN DSAPSLEY WEST DSARDOCH DSARDTREA DSARGYLE DSARMITAGE TS DESN1ARMITAGE TS DESN2ARMOW DSARNPRI AIRPORT DSARNPRI ELGIN DSARNPRI MADAWASKA DSARNPRI MCLACHLIN DSARNPRI REID ST DSARNPRI ZERVOS DSARNPRIOR TSARVA DSASPDIN DSATHENS DSATWOOD SOUTH DSAUBURN DSAVONMORE DSAWENDA DSAYLMER TSAZILDA DSBAILEYS CORNER DSBAINSVILLE DSBALA RIVER DSBALLANTRAE DSBALLYDUFF DSBALMER DSBALTIMORE DSBANCROFT DS #2BANCROFT HERITAGE DSBANDA DSBARRIE TSBARRYS BAY DS #1BARRYS BAY DS #2BARWICK DSBARWICK TSBASIN TSBASS LAKE DSBATH DSBATHURST TS DESN1BATHURST TS DESN2BATTERSEA DSBAXTER DSBAYFIELD DSBAYRIDGE DSBAYSIDE DSBAYSVILLE DSBEACH TS DESN1BEACH TS DESN2BEACHBURG DSBEAMSVILLE TSBEARDMORE DS #2BEAUMARIS DSBEAVERTON TSBECKWITH DSBEECHWOOD DSBELLE RIVER DS #1BELLE RIVER TSBELLEVILLE DS #2BELLEVILLE TSBELMONT DSBENSFORT BRIDGE DSBERKELEY DSBERMONDSEY TS DESN1BERMONDSEY TS DESN2BERWICK DSBEST DSBETHANY DSBICKFORD DSBIG CHUTE DSBILBERRY CREEK TSBIRCH ISLAND DSBIRCH TSBIRMINGHAM TS DESN1BIRMINGHAM TS DESN2BIRR DSBISMARK DSBLACK CORNERS DSBLACKSTOCK DSBLENHEIM DSBLIND RIVER DSBLOOMSBURG DSBLUE CHURCH DSBLUE MOUNTAIN DSBLYTH DSBLYTHESWOOD DSBOBCAYGEON ANNE DSBOBCAYGEON BOYD DSBOBCAYGEON DUKE DSBOBCAYGEON WEST DSBOB-LO DSBOLSOVER DSBOLTON HARDWICK DSBOLTON KING DSBONDHEAD DSBONFIELD DSBOSTON MILLS DSBOTANY DSBOTHWELL CORNERS DSBOTHWELL DS #2BOURGET DSBOWEN CORNERS DSBOWMANTON DSBRACEBRIDGE TSBRADFORD DSBRAMALEA TS DESN1BRAMALEA TS DESN2BRAMALEA TS DESN3BRANT TSBRANTFORD TSBRIDGENORTH DSBRIDGMAN TS DESN1BRIDGMAN TS DESN2BRIDGMAN TS DESN3BRIDGMAN TS DESN4BRIGDEN DSBRIGHTON DIVISION DSBRIGHTON DS #2BRIGHTON PINNACLE DSBRIGHTON SHARPE DSBROCKS BEACH DSBROCKVIL CEDAR DSBROCKVIL CENTENNI DSBROCKVIL GEORGE DSBROCKVIL PARK DSBROCKVIL PARKDALE DSBROCKVIL SCHOFLD DSBROCKVIL WATER DSBROCKVILLE TSBRONTE TSBRONTE TS DESN1BROOKHOLM DSBROOKSIDE DSBROWN HILL DSBROWN HILL TSBRUNELLE DSBRUSSELS DSBUCHANAN TSBUCKHORN DSBUNTING TSBURFORD DSBURKS FALLS SOUTH DSBURLEIGH DSBURLINGTON TSBURNHAM DSBUTTERNUT DSBUTTONVILLE TSCACHE BAY DSCAINTOWN DSCALABOGIE DSCALEDON DSCALEDONIA ARGYLE DSCALEDONIA TSCALLANDER DSCALSTOCK DSCAMERON DSCAMILLA DSCAMLACHIE DSCAMPBELFD ALMA DSCAMPBELFD FRONT N DSCAMPBELFD INDUST DSCAMPBELFD KING DSCAMPBELL TS DESN1CAMPBELL TS DESN2CAMPBELLCROFT DSCANFIELD DSCARDIFF TSCARLAW TSCARLETON PLACE DS #2CARLEY DSCARLING DSCARLING TSCARLISLE DSCARLT PL BRIDGE DSCARLT PL EDMUND DSCARLT PL FRANCIS DSCARLT PL NAPOLEON DSCARLTON TS DESN1CARLTON TS DESN2CARP DSCARRYING PLACE DSCASS BRIDGE DSCASSELMAN DSCASTLETON DSCATARACT DSCATARAQUI DSCAVAN DSCECIL TS DESN1CECIL TS DESN2CEDAR MILLS DSCEDAR TS DESN1CEDAR TS DESN2CENTRALIA DSCENTRALIA TSCEYLON DSCHAPLEAU DSCHARLES TS DESN1CHARLES TS DESN2CHATHAM HARWICH DSCHATHAM RALEIGH DSCHATSWORTH DSCHELMSFORD DSCHELMSFORD MORGAN DSCHEMUNG DSCHERRYWOOD TSCHESLEY HAWKINS DSCHESTERS CORNERS DSCHESTERVILLE BRAN DSCHESTERVILLE DS #2CHESTERVILLE FRD DSCHESTERVILLE TSCHURCHILL MEADOWS TSCLARABELLE TSCLARENCE DSCLARKE TSCLARKSBURG DSCLAYTON DSCLEAR LAKE DSCLEARWATER BAY DSCOBALT DSCOBDEN DSCOBDEN TSCOBOCONK DSCOCHRANE WEST DSCOE HILL DSCOLBORNE DS #2COLDSTREAM DSCOLDWATER DSCOLGAN DSCOLLINS BAY DSCOLPOYS BAY DSCOMBERMERE DSCOMET DSCOMMANDA DSCOMMERCE WAY TSCONCORD DSCONISTON TSCONSECON DSCONSTANCE DSCOOKSTOWN WEST DSCOOKSVILLE TS DESN1COOKSVILLE TS DESN2CORBEIL DSCORBETTON DSCORUNNA DSCOTTAM DSCOURTICE DSCOURTLAND DSCOUTSVILLE DSCRAIG DSCRAIGHURST DSCRAIGLEITH DSCRAMPTON DSCRANBERRY LAKE DSCRAWFORD TSCREEMORE DSCRILLY DSCROSBY TSCROSBY TS DESN1CROW RIVER DSCROWLAND TSCROWN HILL DSCROYDON DSCROZIER DSCRYSLER DSCRYSTAL FALLS TSCULTUS DSCUMBERLAND DSCUMBERLAND TSCURRIE DSCURVE INN DSDACK DSDARTFORD DSDECEWSVILLE DSDEEP RIVER DSDEERHURST DSDELAWARE DSDELHI ANN DSDELHI DS #2DELHI INDUSTRIAL DSDELORO DS #1DEMORESTVILLE DSDES JOACHIMS DSDESERONTO DSDEVLIN DSDEWITT CORNERS DSDICKENSON ROAD DSDIRLETON DSDIXONS CORNERS DSDOANE DSDOBBIN DSDOBBIN TSDOMINION DRIVE DSDOMVILLE DSDORCAS BAY DSDORCHESTER DSDORCHESTER POND DSDORSET DSDOUGLAS POINT TSDOVER CENTRE DSDRAYTON DSDRESDEN DSDRUMBO DSDRUMMOND DSDRYDEN COLONIZATN DSDRYDEN GOVERNMENT DSDRYDEN RURAL DSDRYDEN TSDRYDEN WILDE DSDUART TS DESN1DUBLIN DSDUFF DSDUFFERIN TS DESN1DUFFERIN TS DESN2DUNBOYNE DSDUNCHURCH DSDUNDALK VICTORIA DSDUNDAS SYDENHAM DSDUNDAS TSDUNDAS TS #2DUNEDIN DSDUNLOP DSDUNNVILLE DSDUNNVILLE TSDUNSFORD DSDUNTROON DSDUPLEX TS DESN1DUPLEX TS DESN2DURHAM ELGIN DSDURHAM ROAD DSDUTTON DSDWIGHT DSDYMOND TSEAMER DSEAR FALLS DSEAR FALLS TSEARLS LAKE DSEARLTON DSEAST LUTHER DSEDGEWARE TSEGANVILLE BRUCE DSELGIN DSELGIN TS DESN1ELGIN TS DESN2ELGINBURG DSELK LAKE DSELLESMERE TSELLIOT LAKE DSELLIOT LAKE MISS DSELLIOT LAKE TSELMHURST DSELMIRA TSELMVALE DSELORA UNION DSELSINORE DSEMBRUN DSEMO DSEMSDALE DSENGLEHART NORTH DSENNISMORE DSERAMOSA DSERIEAU DSERIN DSERINDALE TS DESN1ERINDALE TS DESN2ERINDALE TS DESN3ESPANOLA DSESPANOLA TSESPLANADE TSESSEX DSESSEX TSETON DSEVERETT DSEVERETT TSEVERSLEY DSEVERTON DSEXETER DS #2EXETER ROSEMOUNT DSEXETER SANDERS DSEXETER WELLINGTON DSFAIRBANK TS DESN1FAIRBANK TS DESN2FAIRCHILD TS DESN1FAIRCHILD TS DESN2FAIRFIELD DSFARLAIN LAKE DSFAUQUIER DSFENELON F CLIFTON DSFENELON F ELLIOTT DSFENELON FALLS DSFERGUS EAST DSFERGUS TSFERGUSONVALE DSFERNDALE DSFIDDLERS GREEN DSFINCH TS DESN1FINCH TS DESN2FIRTHS CORNERS DSFLYNNS CORNERS DSFOOTES BAY DSFOREST JEFFERSON DSFOREST JURA DSFOREST LEA DSFOREST MCNAB DSFOREST UNION DSFORT WILLIAM TSFRANKFORD DS #2FRANKFORD PATRICK DSFREELTON DSFROGMORE DSFRONTENAC TSGAGE TS DESN2GAGE TS DESN3GAGE TS DESN4GALETTA DSGALT TSGANANOQUE DSGARDINER DSGARSON DSGEORGINA BURKE DSGERALDTON NORTH DSGERALDTON SOUTH DSGERRARD TS DESN1GLEN ALLAN DSGLEN BECKER DSGLEN SANDFIELD DSGLENARM DSGLENCOE DSGLENDALE TSGLENDALE TS DESN2GLENGARRY DSGLENGROVE TS DESN1GLENGROVE TS DESN2GODERICH TSGOLDEN BEACH DSGOLDEN LAKE DSGOLDEN VALLEY DSGOODFISH DSGOODWOOD DSGORE BAY DSGOREWAY TS DESN1GOREWAY TS DESN2GORMLEY DSGORRIE DSGOUROCK DSGRAFTON DSGRAND BEND DSGRAND BEND EAST DSGRAND BEND MUNI DSGRAND VALLEY DS #2GRASSMERE DSGRAVENHURST DSGREELY DSGREEN PARK DSGREEN VALLEY DSGREENBANK DSGREENLAND DSGREENOCK DSGREENS CORNER DSGREENSVILLE DSGREENWOOD DSGRENFEL DSGRETNA DSGUELPH DSGULL RIVER DSGUTHRIE DSHAILEYBURY DSHALIBURTON DSHALLS LAKE DSHALTON TSHAMPTON DSHANLON TSHANMER DSHANMER KENNETH DSHANOVER TSHARCOURT DSHARRISTON DS #2HARROWSMITH DSHASTINGS DSHASTINGS ELGIN DSHAVELK INDUSTRIAL DSHAVELOCK TSHAWKESTONE DSHAWLEY DSHAWTHORNE TSHAYCROFT DSHEARST TSHECKSTON DSHEPWORTH DSHERRIDGE LAKE DSHIGHBURY TSHIGHGATE DSHILLSBURGH DSHINCHEY TSHINCHINBROOKE DSHOCKLEY DSHOLLAND DSHOLLAND LANDING DSHOLLAND TSHOLSTEIN DSHOMESTEAD DSHONEY HARBOUR DSHORNEPAYNE DSHORNER TSHORNING MILLS DSHORNING TSHORSESHOE LAKE DSHORSEY BAY DSHOYLE DSHUNTSVILLE DSHURON PARK DSHURONDALE DSINDUSTRIAL ROAD DSINGERSOLL TSINGLESIDE DSINGLESIDE WEST DSIROQUOIS FALLS DSISLAND GROVE DSIVY LEA DSJARVIS DSJARVIS TSJASPER DSJELLICOE DSJOHN TS DESN1JOHN TS DESN2JOHN TS DESN3JOHNSTOWN DSJONES CREEK DSJONES ROAD DSJOYCEVILLE DSKAKABEKA DSKAMREG DSKAPUSKASING TSKARS DSKEEWATIN DSKEITH TS DESN1KEMBLE DSKEMPTVIL HARRIET DSKEMPTVIL V BUREN DSKEMPTVILLE KING DSKEMPTVILLE WEST DSKENILWORTH DSKENILWORTH TS DESN1KENILWORTH TS DESN2KENNISIS LAKE DSKENOGAMI DSKENORA DSKENT TS DESN1KENT TS DESN2KERWOOD DSKESWICK DSKILLALOE DSKILLBEAR DSKIMBERLEY DSKINCARDINE DS #2KING EDWARD TSKINGSTON GARDINER TS DESN1KINGSTON GARDINER TS DESN2KINGSTON MILLS DSKINGSVIL PULFORD DSKINGSVILLE TSKINMOUNT DSKINTORE DSKIRBY DSKIRKFIELD DSKIRKLAND LAKE DS #1KIRKLAND LAKE TSKIRKTON DSKLEINBURG TSKOMOKA DSLA CAVE NORTH DSLA CAVE SOUTH DSLAFOREST ROAD DSLAGOON CITY DSLAKE ST.GEORGE DSLAKE TS DESN1LAKE TS DESN2LAKE VERNON DSLAKEFIELD DS #1LAMBTON TSLANARK DSLANCASTER DSLARCHWOOD DSLARCHWOOD TSLARDER LAKE DSLAUZON TS DESN1LAUZON TS DESN2LEAMINGTON DS #2LEASIDE TS DESN1LEASIDE TS DESN2LEAMINGTON TSLEBEL DSLESLIE TS DESN1LESLIE TS DESN2LILY LAKE DSLIMOGES DSLINCOLN HEIGHTS TSLINDSAY ANGELIN S DSLINDSAY COLBORNE DSLINDSAY DENNISTON DSLINDSAY DURHAM W DSLINDSAY EASTVIEW DSLINDSAY EGLINGTON DSLINDSAY TSLISGAR TSLISTOWEL BRIGHT DSLISTOWEL DAVIDSON DSLISTOWEL ELMA DSLITTLE BRITAIN DSLITTLE CURRENT DSLIVELY DSLODGEROOM DSLONG SAULT NORTH DSLONGLAC EAST DSLONGLAC TSLONGLAC WEST DSLONGUEUIL DSLONGUEUIL TSLONGWOOD TSL'ORIGNAL DSLORNE PARK TSLUCAN MARKET DS - 4.16 KVLUCAN MARKET DS - 8.32 KVLUCKNOW DSLYN DSLYNDHURST DSLYTHMORE DSMACVILLE DSMADAWASKA DSMADOC DS #2MADOC MADAWASKA DSMADSEN DSMAIDSTONE DSMAIN TSMAIR MILLS DSMAITLAND DSMALDEN TSMALLORYTOWN DSMALVERN TSMANBY TS DESN1MANBY TS DESN2MANBY TS DESN3MANITOULIN TSMANITOUWADGE DSMANITOUWADGE DS #2MANITOUWADGE TSMANITOUWANING DSMANOTICK DSMANSFIELD DSMARATHON DSMARGACH DSMARIONVILLE DSMARKDALE MCDUFF DSMARKDALE TORONTO DSMARMION DSMARMORA REGINALD DSMARTHAVILLE DSMARTINDALE TSMARTINTOWN DSMARYSVILLE DSMASSEY DSMATACHEWAN DSMATHESON DSMAXVILLE GEORGE DSMAXVILLE PRINCE DSMAYNOOTH DSMAZINAW DSMCCRACKENS DSMCCRIMMON DSMCCUE DSMCGOWAN LAKE DSMCGREGOR DSMCKELLAR DSMCNAB DSMEADOWVALE TSMEAFORD DS #2MEAFORD EDWIN DSMEAFORD LOUISA DSMEAFORD THOMPSON DSMEAFORD TSMEAFORD VINCENT DSMEDONTE DSMERLIN DSMERRICKVILLE DSMETCALFE DSMIDHURST DSMIDHURST TS DESN1MIDHURST TS DESN2MILDMAY DSMILFORD DSMILLBROOK DSMILLGROVE DSMILLINGTON DSMILSAP DSMILVERTON DS #1MILVERTON DS #2MINAKI DSMINDEMOYA DSMINDEN DSMINDEN TSMINETT DSMITCHELL DSMODELAND TSMOHAWK TSMONKTON DSMONO MILLS DSMONTEITH DSMOONSTONE DSMOOSE LAKE TSMOOSONEE DSMORRISBURG TSMORRISH CHURCH DSMOUNT ALBERT DSMOUNT BRYDGES DSMOUNT CARMEL DSMOUNT FOREST DS #2MOUNT HOPE DSMOUNTAIN CHUTE DSMOUNTAIN LAKE DSMOUNTAIN VIEW NTH DSMOUNTJOY DSMURILLO DSMURRAY HILLS DSMURRAY TS DESN1MURRAY TS DESN2MUSKOKA FALLS DSMUSKOKA TSNAKINA DSNAPANEE DS #2NAPANEE INDUSTRIAL DSNAPANEE MILL DSNAPANEE NORTH DSNAPANEE TSNAVAN DSNEBO TS DESN1NEBO TS DESN2NELSON TS DESN1NEPEAN TSNESTLETON DSNESTOR FALLS DSNEUSTADT DSNEW LISK HALIBTON DSNEW LISK NIPISSNG DSNEWBORO DSNEWINGTON DSNEWPORT DSNEWTON TSNEWTONVILLE DSNIPIGON DSNOBLETON DSNOELVILLE DSNORFOLK TSNORTH AUGUSTA DSNORTH AUGUSTA DS #2NORTH BAY TSNORTH COBALT DSNORTH PORCUPINE DSNORTH SHORE DSNORTHBROOK DSNORTHCOTE DSNORWICH NORTH DSNORWOOD DSNOTTAWAGA DSOAKVILLE TSOAKWOOD DSODESSA DSOIL SPRINGS DSOMEMEE CHURCH DSOMEMEE DSONAPING DSOPS DSORANGEVILLE DS #3ORANGEVILLE TS DESN1ORANGEVILLE TS DESN2ORILLIA TSORLEANS TSORO DSORONO DSOSGOODE DSOSLER DSOSPRINGE DSOSTRANDER DSOTONABEE DSOTONABEE TS DESN1OTONABEE TS DESN2OTTER LAKE DSOTTERVILLE DSOTTO HOLDEN TSOUELLETTE DSOUSTIC DSOVERBROOK TSOWEN SND 12 ST E DSOWEN SND 12 ST W DSOWEN SND 16 AVE E DSOWEN SND 2 AVE E DSOWEN SND 24 ST W DSOWEN SND 3 AVE E DSOWEN SND 6 ST E DSOWEN SOUND DS #2OWEN SOUND TSOXFORD MILLS DSOXLEY DSOXMEAD DSPAISLEY DS #2PAKENHAM DSPALERMO TSPALMERSTON TSPARK ROAD DSPARKHILL DSPARRY SOUND TSPAUDASH DSPEARL LAKE DSPEFFERLAW DSPELEE ISLAND DSPELHAM CENTRE DSPEMBROKE DSPEMBROKE TSPERRAULT FALLS DSPERTH DSPERTH HALTON DSPERTH NORTH DSPERTH SCOTCH LINE DSPERTH SUNSET DSPERTH WILSON DSPETAWAWA DSPETERS CORNERS DSPETHERICKS CORNRS DSPIC DSPICTON BARKER DSPICTON DISRAELI DSPICTON DSPICTON TSPICTON UPPER LAKE DSPIGEON LAKE DSPINE RIVER DSPINEGROVE DSPINELANDS DSPINESTONE DSPLAINFIELD DSPLANTAGENET DSPLATTSVILLE DSPLEASANT POINT DSPLEASANT TS DESN1PLEASANT TS DESN2PLEASANT TS DESN3PLEASANTVILLE DSPOINTE AU BARIL DSPONSONBY DSPOONAMALIE DSPORRIDGE LAKE DSPORT ALBERT DSPORT ARTHUR TS #1PORT BOLSTER DSPORT COLBORNE TSPORT DOVER SCOTT DSPORT DOVER ST. ANDREWS DSPORT ELGIN DSPORT HOPE TS DESN1PORT HOPE TS DESN2PORT LAMBTON DSPORT PERRY DSPORT SEVERN DSPORTELANCE DSPOST CREEK DSPOWASSAN DSPRECIOUS CORNERS DSPRENEVEAU DSPRESTON TSPRINCETON DSPROSPECT DSPROSPECT HILL DSPUNKIDOODLES DSPUSLINCH DSRAINY RIVER DSRAMA DSRAMORE TSRED LAKE DSRED LAKE TSRED ROCK DSREDBRIDGE DSREDDENDALE DSREDNERSVILLE DSREID CORNERS DSRENFREW PUCKER DSREXDALE TSRICE DSRICE LAKE DSRICHVIEW TS DESN1RICHVIEW TS DESN2RICHVIEW TS DESN3RIDGETOWN PALMER DSRINGWOOD DSRIPLEY DSRIVERDALE TSROCK MILLS DSROCKLAND DSROCKLAND EAST DSROCKWOOD DSRODNEY WEST DSRONDEAU DSROSE CORNERS DSROSEDALE DSROSENEATH DSROSEVILLE DSROSSEAU DSROTHSAY DSROWS DSRUGBY DSRUNNYMEDE TSRUSSELL DSRUSSELL DS #2RUSSELL TSRUTHERFORD DSRUTHERGLEN DSRUTHVEN DSRYLSTONE DSSAM LAKE DSSAPAWE DSSAUBLE BEACH DSSAUBLE RIVER DSSCARBORO TS DESN1SCARBORO TS DESN2SCHOMBERG DSSCHREIBER WINNIPG DSSCIENCE HILL DSSCOTLAND DSSCUGOG ISLAND DSSEAFORTH DSSEAFORTH TSSEAGRAVE DSSEBRIGHT DSSHABAQUA DSSHANNONVILLE DSSHARBOT DSSHARON DSSHEDDEN DSSHEFFIELD DSSHELBURN ANDREW DSSHELBURN FIDDLEPK DSSHELBURNE DS - 4.16 KVSHELBURNE DS - 8.32 KVSHEPPARD TS DESN1SHEPPARD TS DESN2SHININGTREE DSSIBBALD DSSIDNEY TSSILVER CREEK DSSIMCOE BLUELINE DSSIMCOE EVERGREEN DSSIMCOE IRELAND DSSIMCOE WELLINGTON DSSIOUX NARROWS DSSLATE FALLS DSSLATER TSSLEEMAN DSSLESWICK DSSMITHFIELD DSSMITHS FALLS DSSMITHS FALLS TSSMITHS FLS ELMSLY DSSMITHS FLS JAMES DSSMITHS FLS LORNE DSSMITHS FLS MARKET DSSMITHS FLS PEARL DSSMITHS FLS PERCY DSSMOOTH ROCK FALLS DSSNELGROVE DSSNOW ROAD DSSOLINA DSSOUTH GLOUCESTER DSSOUTH GOWER DSSOUTH MARCH TSSOUTH PORCUPINE DSSOUTHWOLD DSSOWERBY DSSPANISH DSSPARROW LAKE DSSPENCERVILLE DSSPINE DSSPRINGFIELD DSSPRINGVALE DSSPRINGVILLE DSSQUIRE DSST ANDREWS TSST GEORGE DSST ISIDORE DSST ISIDORE TSST LAWRENCE TSST MARYS DSST MARYS TSST ONGE DSST THOMAS DSST THOMAS TS DESN1ST THOMAS UNION DSST WILLIAMS DSSTANLEY TSSTARDALE DSSTAYNER TSSTEWARTVILLE TSSTIRLING BAKER DSSTIRLING DSSTIRTON TSSTOUFFVIL 10 LINE DSSTRACHAN TS DESN1STRACHAN TS DESN2STRAFFORDVILLE DSSTRATFORD DSSTRATFORD EASTHP DSSTRATFORD TSSTRATHROY DSSTRATHROY TSSTRIKER DSSTURGEON FALLS DSSUNDERLAND DSSUNDRIDGE DSSUNDRIDGE NORTH DSSUNNIDALE CORNERS DSSUTTON BASE LN DS #1SUTTON DS #2SWANSON DSTALBOT TS DESN1TALBOT TS DESN2TAMWORTH DSTARA DS #2TAUNTON DSTAYLOR DSTAYLOR KIDD DSTEMAGAMI DSTERAULEY TS DESN1TERAULEY TS DESN2TESSIER DSTHAMESVILLE NORTH DSTHEDFORD DSTHESSALON PEACHY DSTHORAH DSTHORNDALE DSTHORNTON DSTHORNTON TSTHOROLD ALLANPORT DSTHOROLD CLEVELAND DSTHOROLD DEFOE DSTHOROLD FRONT DSTHOROLD ORMOND DSTHOROLD PT ROBINS DSTHOROLD SOUTH DSTHOROLD TSTHOROLD TURNER DSTHRASHERS CORNERS DSTHUNDER BEACH DSTILBURY PELTIER DSTILBURY TSTILBURY WEST DSTILLSONBURG DSTILLSONBURG TSTIMMINS TSTINCAP DSTIVERTON DSTOMKEN TS DESN1TOMKEN TS DESN2TORY HILL DSTOTTENHAM NORTH DSTRAFALGAR TSTRALEE DSTREMAINE TSTRENTON BAY DSTRENTON DIXON DSTRENTON DSTRENTON DUFFERIN DSTRENTON DUNDAS W DSTRENTON FRANKFORD DSTRENTON MCAULEY DSTRENTON MCNICHOL DSTRENTON OAK DSTRENTON PELHAM DSTROUT CREEK DSTROUT LAKE TSTROY DSUFFORD DSULLSWATER DSUTOPIA DSUTTERSON DSUXBRIDGE DS #1UXBRIDGE DS #2VAL CARON DSVALLEY EAST DSVALORA DSVANASTRA DSVANDELEUR DSVANKLEEK HILL DSVANKLEEK TERRY FOX DSVANSICKLE TSVERMILION BAY DSVERNER DSVICTORIA HARBOUR DSVIENNA DSVINELAND DSVIOLET HILL DSVIRGINIA BEACH DSVIRGINIATOWN DSVITTORIA DSWAINFLEET DSWALKER TS #1WALKERS POINT DSWALKERTON DS #2WALLACE DSWALLACE TSWALLACEBURG DSWALLACEBURG TSWALLBRIDGE DSWANAPITEI DSWANSTEAD TSWANUP DSWARDEN TSWARDSVILLE DSWARKWORTH DSWARREN DSWARTBURG DSWARWICK DSWASHAGO DSWASHBURN ISLAND DSWATERFORD JAMES DSWAUBAMIK DSWAUBAUSHENE NORTH DSWAUBAUSHENE TSWAUPOOS DSWELCOME DSWELLAND EFFINGHAM DSWELLINGTON DSWELLINGTON WHARF DSWENDOVER DSWESLEY DSWEST BAY DSWEST FLAMBORO DSWEST LAKE DSWEST LORNE DSWESTBROOK DSWESTON LAKE DSWESTWOOD DSWHARNCLIFFE DSWHEATLEY DS #2WHITBY TS DESN1WHITBY TS DESN2WHITE RIVER DSWHITEDOG DSWHITEFISH DSWHITNEY DSWIARTON CLAUDE DSWILHAVEN DSWILLIAMSTOWN DSWILLOW BEACH DSWILSON TS DESN1WILSON TS DESN2WILSONVILLE DSWILTSHIRE TS DESN1WILTSHIRE TS DESN2WINCHESTER DUFFRN DSWINCHESTER ST LAW DSWINGHAM DSWINGHAM TSWINONA TSWOLSEY LAKE DSWOLVERTON DSWONDERLAND TSWOODBINE DSWOODBRIDGE TS DESN1WOODBURN DSWOODLAND BEACH DSWOODLAWN DSWOODROFFE TSWOODS DSWOODSTOCK BURTCH DSWOODSTOCK DEVONSHIRE DSWOODSTOCK EAST DSWOODSTOCK SPRINGBANK DSWOODSTOCK TSWOODVILLE DSWOOLER DSWROXETER DSWYEVALE DSWYOMING CHURCHILL DSWYOMING NORTH DSYARMOUTH CENTRE DSYONGES MILLS DSYOUNGSVILLE DSZORRA DSZURICH DSFeeder (optional to leave blank for behind the meter projects):Feeder Voltage (kV) (optional to leave blank for behind the meter projects):Project Size (kW) total maximum output capacity:Equipment Capacity (kVA) total equipment nameplate rating:Fuel/Energy Type select all that apply: Solar (PV) Wind Water Natural Gas Biogas Biomass Diesel Battery Energy Storage System UPS CHP/Co-gen Other (specify below) Specify Other:Type of Connection: Single Phase Three Phase If this is a solar project, please answer the following questions:Mounting Type:SelectCombinationGround MountRooftopIf this is a water project, please answer the following questions:Is your generation facility located on provincial Crown or federally‐regulated lands? Yes No Is water your primary energy source? Yes No SECTION G: STATION SERVICE LOAD INFORMATIONThe host customer’s station service load details.If there is an existing account at the project location, populating the fields in Section G is required for WNP. Ensure selection below matches with this note Required Optional Maximum Demand of Station Service Load of DER kW:Average Monthly Consumption kWh: SECTION H: CONNECTION INFORMATIONOn a cut-out from the WNP DOM (Distribution Operating Map), or a site plan if a DOM is not made available by the LDC, provide the location of the generation facility with proposed line routings for connection to WNP’s distribution system. It should identify the Point of Expansion (POE), the Point of Common Coupling (PCC), the location of the generation facility, and (if applicable) the route of the new line between the generation facility and the POE (ie. on private property or public road/right-of-way). This is not required for existing load customers that are connecting a load displacement generation, net metering generation or energy storage system behind their existing metered connection point. Please see “Appendix A” for a visual representation of POE and PCC.DOM Drawing/Sketch Number:DOM Revision Number:Please provide an SLD of the Generator’s facilities, including the PCC, transformer and connecting station, feeder, and supply voltageSLD Drawing/Sketch Number:SLD Revision Number:POE Latitude degree decimal format:POE Longitude degree decimal format:PCC Latitude degree decimal format:PCC Longitude degree decimal format:Generation Facility Latitude degree decimal format:Generation Facility Longitude degree decimal format:Length of Line fromPOE to PCC km:Length of Line from PCC to Generation Facility km:Important: The line between the PCC and the Generation Facility must NOT be shared with any other DER owner (refer to Appendix A). Conductor Type/Size for the line between the PCC and the Generation Facility:Generator Fault Contribution with fault location at the PCC:IMPORTANT NOTES: If this project requires line expansion work between the POE and PCC, WNP will provide a cost estimate to construct any line located on public road right-of-way. The cost estimate will include a breakdown of uncontestable work (i.e. overbuild to existing line) that can only be performed by WNP, as well as contestable work (i.e. new construction/green-field) that may be performed by the Generator, their contractor or WNP. The design of uncontestable and contestable work shall conform to WNP specifications). For Generator-owned line, the Generator may apply to construct the line on existing WNP-owned poles. This is known as an application for Joint Use (JU) of poles. If the application is accepted, WNP will provide the Generator with information on initial connection costs, annual pole-space rental and emergency service (ES) fees, and required JU & ES Agreements. SECTION I: ENERGY STORAGE OR UPSPlease complete the following section if your project includes energy storage.Number of Units:Inverter Unit Size:Energy Storage Unit Size kWh:Total Energy Storage Size kWh:Energy Storage Facility Control Strategy: Peak Shaving DynamicVAR Support Frequency Support Other Other (ESFCS)Please submit a detailed description of the control strategy according to the templates in Appendix B. WNP reserves the right to modify the control strategy as part of its Detailed Technical Connection Assessment. SECTION J: LOAD DISPLACEMENT/PEAK SHAVINGPlease complete the following section if this is a load displacement or peak shaving project.Operating Mode: Parallel Non‐Parallel Transition Type: Closed “make before break” Open “break before make” Time that generator remains parallel to grid:For non-parallel load displacement, SCADA monitoring and Gross Load Billing (GLB) may apply. For load displacement generation facilities, please attach a schedule of the forecasted maximum generation output (as a function of loading of the facility). At a minimum, include the forecasted generation output information (i.e. Watts and VARs) during the minimum and maximum of the load facility to which the load displacement generator is connecting (see Appendix C for template). SECTION K: DER CHARACTERISTICSFor facilities with multiple generators: If your generators have different characteristics, please use the “Add Page” button and provide the characteristics for each generator on the additional pages.DER type: Synchronous Induction Inverter based Other DER Type Other:Number of Generating Units:Rated Capacity of Each Unit (kW):Rated Capacity of Each Unit (kVA):DER Output Voltage in kV:Manufacturer:Type or Model Number:If Power Conversion Type is “Other”, please provide values equivalent to a Synchronous or Induction type generator.Maximum Starting In‐rush Current:Generator Winding Connection: Delta Star Neutral Grounding Method for star winding connection only: Solid Ungrounded Impedance Impedance R in ohms:Impedance X in ohms:Limits of range of reactive power at the machine output:Lagging over‐excited, kVAR:Lagging Power Factor:Leading under‐excited, kVAR:Leading Power Factor:Limits of range of reactive power at the PCC:Lagging over‐excited, kVAR:Lagging Power Factor:Leading under‐excited, kVAR:Leading Power Factor:For synchronous unitsNominal Machine Voltage kV (LL):Unsaturated Reactance kVA Base:Unsaturated Reactance kV Base:Direct Axis Subtransient Reactance, Xd’’ pu:Direct Axis Transient Reactance, Xd’ pu:Direct Axis Synchronous Reactance, Xd pu:SubtransientTime, Td’’ ms:Zero Sequence Reactance, X0 pu:For induction units Nominal Machine Voltage kV (LL):Unsaturated Reactance kVA Base:Unsaturated Reactance kV Base:Direct Axis Subtransient Reactance, Xd’’ pu: SECTION L: INTERFACE TRANSFORMERThe transformer connecting to the WNP distribution system.Transformer Ownership: Customer WNP Transformer Rating KVA:Transformer Type: Single Phase Three Phase Nominal Voltage of High Voltage Winding kV:Nominal Voltage of Low Voltage Winding kV:Impedance Base (if different than ratings above) kVA Base:Impedance Base (if different than ratings above) kV Base:Impedance (R) pu:Impedance (X) pu:Impedance (Z%) %:High Voltage Winding Connection: Delta Star High Voltage Grounding Method for star winding connection only: Solid Ungrounded Impedance Star Impedance R in ohms:Star Impedance X in ohms:Low Voltage Winding Connection: Delta Star Low Voltage Grounding Method for star winding connection only: Solid Ungrounded Impedance Star Impedance R in ohms:Star Impedance X in ohms:Notes: The term “High Voltage” refers to the connection voltage to WNP’s distribution system and “Low Voltage” refers to the generation or any other intermediate voltage. Providing a photo of transformer equipment along with this application may help expedite your application. SECTION M: INTERMEDIATE TRANSFORMERTransformer between the interface transformer and DER.Please complete the following section if your project includes an intermediate transformer.Do you intend to install an intermediate transformer? Yes No Transformer Rating KVA:Transformer Type: Single Phase Three Phase Nominal Voltage of High Voltage Winding kV:Nominal Voltage of Low Voltage Winding kV:Impedance kVA Base:Impedance kV Base:Impedance R pu:Impedance X pu:High Voltage Winding Connection: Delta Star High Voltage Grounding Method for star winding connection only: Solid Ungrounded Impedance Star Impedance R in ohms:Star Impedance X in ohms:Low Voltage Winding Connection: Delta Star Low Voltage Grounding Method for star winding connection only: Solid Ungrounded Impedance Star Impedance R in ohms:Star Impedance X in ohms:Notes: The term “High Voltage” refers to the connection voltage to WNP's distribution system and “Low Voltage” refers to the generation or any other intermediate voltage. SECTION N: HIGH-VOLTAGE GROUNDING TRANSFORMERPlease complete the following section if your project includes a high-voltage grounding transformer.Do you have a high‐voltage grounding transformer? Yes No Transformer Type: Zig‐Zag Star‐Delta ZeroSequence Impedance (Z0)R ohms:Zero Sequence Impedance (Z0) X ohms: SECTION O: SUBMISSION CHECKLISTSubmission Checklist:Please ensure the following items are completed prior to submission. Your application may not be processed if any part is omitted or incomplete: Payment in full including applicable taxes (by cheque payable to “Wellington North Power”) Completed Form B stamped by a Professional Engineer Signed Study Agreement (original signature is required) Single Line Diagram (SLD) of the Generator’s facilities, must be stamped by a Professional Engineer Protection Philosophy Distribution Operating Map (DOM) and/or Site Plan Load Displacement Generation Facility’s load and generation schedules (if applicable) Load Displacement Generation Facility’s mode of operation (if applicable) Energy Storage Facility operating strategy description an parameters (if applicable) Emergency Backup Generation Facility’s mode of operation (if applicable) SECTION P: CIA APPLICATION FEE CHECKLISTPlease ensure the following items are completed prior to submission. Your application will not be processed if any part is omitted or incomplete. Check all that apply:Applicable CIA Fee:See the Connection Impact Assessment Fee Schedule on our website for costs. Please enter the amount from the fee schedule. Yes Applicable CIA Fee + HSTTransmission Customer Impact Assessment (TxCIA) Fee (if applicable):A TxCIA is also required if the total nameplate generation of the project is greater than 10MW Yes (TxCIA) Fee + HSTIESO System Impact Assessment (SIA) Fee (if applicable): Yes An SIA deposit is required if the total nameplate generation of the project is greater than 10MW. The total cost of the SIA will be Trued Up/Down upon the receipt of the SIA from the IESO. See the IESO’s SIA Application for costs.IESO System Impact Assessment (SIA) Fee: SECTION Q: ATTACHMENTSAttached Documents / DrawingsAttached Documents / Drawings:Max. file size: 128 MB. SECTION R: NOTESNotes: SECTION S: WNP Specific Required FieldsThis section contains specific information that is required by WNP. Please read Section T notes regarding this section if you need further details.What is the barcode of the nearest pole serving the project location?WNP Account Number if transformer is owned by WNP: SECTION T: WNP Specific Additional NotesSection A: no additional notes Section B: no additional notes Section C: no additional notes Section D: no additional notes Section E: no additional notes Section F: no additional notes Section G: no additional notes Section H: no additional notes Section I: no additional notes Section J: no additional notes Section K: no additional notes Section L: At the Generator’s expense, and if requested, WNP may provide transformation up to a maximum of 500 kVA three-phase, as described in the WNP Conditions of Service (Section 3.5 item C.4). Section M: no additional notes Section N: no additional notes Section O: for new DER site, Distribution Operating Map (DOM) is required by WNP in addition to Site Plan Section P: When there is an upstream LDC, an additional fee will be required for costs associated with this LDC’s CIA. Section Q: no additional notes Section R: no additional notes Section S: - For question: "What is the barcode of the nearest pole serving the project location?", this is only applicable if you choose "No" to question: "Is there an existing WNP account at the project location?" in Section D - For question: "WNP Account Number (if transformer is owned by WNP )", this is only applicable if you answer "WNP" to question: "Transformer Ownership" in Section L.